Healthcare
UMass Memorial Medical Ctr. Angio & C-Arm
Worcester, MAArea: 2,500 square feet
Architect: S/L/A/M Collaborative
Timberline served as the general contractor for the Angio and C-Arm renovation at the hospital. The project was valued at over a million and involved a two-room radiology renovation with control room, conference room and two nurse stations. Construction involved demolition efforts and a total renovation with new architectural finishes, as well as MEP components.
This project was divided into two phases within the sensitive location and involved tight trade coordination around the operating facility's schedule. Detailed attention was exercised to provide the necessary infection control measures to keep adjacent affected areas up and running during construction. The installation of medical structural support systems now accommodate new Philips imagining equipment and plumbing work includes new medical gas and vacuum services. The mechanical scope incorporates the installation of a new roof-top air handling unit. The new rooms also received electrical upgrades to the existing services to support the power requirements of the new Philips system. Life safety and fire protection upgrades were also made to the space. The overall new architectural layout accommodates new lighting, lead lined walls, floor finishes, millwork, glass and doors.