Our Team

Church Steeples

 

Saint Clare Church Steeple

Westerly, RI

The purpose of this project was to resolve an issue with inadequate phone service. The unreliable service affected the community as a whole, including interfering with 911 emergency operations. Timberline Construction used a church steeple as a wireless tower, eliminating the need for a full wireless tower. At the start of the job, the shelter was installedand the old steeple was removed. The new steeple arrived on site and all of the antennas and radios were installed inside. Once competed, two team members worked in a man lift to communicate with the crane operator while setting the steeple in place. The pick went very well and the steeple was set on the same day. Following the installation, the steeple was sided and painted.

T-Mobile Turner Falls Church

Turners Falls, MA

A new Carrier space developed inside church steeple which included a 300 square-foot room built on steel platform and Stealth install of six antennas in existing steeple. The TCC team installed Full HVAC, Electrical, telco, and Fire alarm tie in and coordinated with the local electric company and building owner for full electrical upgrade to building.

METRO PCS Church TI

Exeter, NH

A 300 square-foot room was built in a church basement for METRO PCS, Coax runs approximately 150'. Work included Electrical, HVAC, TELCO, and fire alarm tie in; as well as a stealth antenna install in pillars located on top steeple.

Wayside Inn Church

Sudbury, MA

At Timberline Construction Corporation, we listen, learn and understand our clients’ goals and priorities. On the Historic Wayside in Church Inn Sudbury MA., Timberline Construction successfully installed antennas and lines through a 100 year old church for Verizon Wireless. We replaced existing wooden panels with Radio Frequency transparent fiberglass panels.  The 200 sq. ft. equipment room build-out was installed in the basement with full self supported HVAC, electric and FM -200 system fire suppression systems. The photo attached shows the steeple after completion.

At Timberline Construction Corporation we work to adapt and respond, anticipating our clients’ needs and recommending solutions. We strive to exceed our clients’ expectations daily, therefore our clients come to expect the performance and quality products they receive from Timberline Construction.

"Text to come zothecas corrumperet fiducias, et quadrupei fortiter adquireret oratori, ut aegre verecundus concubine insectat oratori, quod Medusa deciperet vix adlaudabilis cathedras, semper Augustus senesceret lascivius fiducias."
John Q. Client, President
ACME Retail Company

Recent News


Timberline Construction Completes Dr. Lucy Sewall Center for Acute Treatment Services Historic Renovation Project at The Dimock Center

Timberline Construction is pleased to announce the project completion of the 18,730 SF state-of-the-art interior and exterior renovation project for the Dr.

Timberline Construction's Growth Sparks New Company Partners - Jeff Burke, Karl Ginand, and Tim McManus

Timberline Construction Corporation, one of the New England’s most respected mid-size Construction Management firms, announced that Jeffrey Burke, Karl Ginand and Tim McManus have been named company Partners.

Timberline Construction Sponsors 2018 Women at Wentworth

“Timberline Construction is proud to announce that we are a sponsor and scholarship fund donor for Wentworth Institute of Technology’s 2018 Women @ Wentworth Event.

Timberline Completes Office Expansion for Sage Therapeutics

High Profile

Cambridge, MA – Timberline Construction has completed an office expansion project for Sage Therapeutics.